welcome to use qingdao cuishi plastic machine for the pp pe single wall corrugated pipe line with pipe diameter 16-50mm

welcome to use qingdao cuishi plastic machine for the pp pe single wall corrugated pipe line with pipe diameter 16-50mm

welcome to use qingdao cuishi plastic machine for the pp pe single wall corrugated pipe line with pipe diameter 16-50mm 

图片1.jpg


Machine name

Size ( L*W*H )

Weight KG

Sj55 single screw extruder

3100*1080*1650

800

High speed calibration table

2040X950*1200

500

Pipe cutter machine

500*500*1200

100

Pipe double position winder

1500*1500*1650

300

Pipe mould

1000*1000*100

1000


How to operate the machine

1. Extruder preheating in advance 1-1.5hours 

图片2.jpg

2. To quickly heat up, replace the heating ring with gas to heat the mold core rod.

It must be fully heated until the material comes out of the core rod customers need to heat the part 3minutes to let material out is ok.


 



If the heating of the die core rod at the machine head is not sufficient, the material directly coming out of the screw will break the machine head.


图片5.jpg


3.After the material come out from the mould die bushing , you should see the material direction.

And then adjust the four large screws of the machine head until the raw materials come straight out of the machine head.


 



4. If the thread is misaligned, adjust the seam line. When the thread is fast on one side and slow on the other, it is necessary to adjust 8 screws to achieve synchronous operation.


图片8.jpg




4.Instructions for using gear pumps

1. Wiring instructions can be found on the top cover

2. This device has functions such as lubrication, intermittency, and setting

The interval time can be set in white. ACT green light time range 1-995 seconds) IN light is on for interval time, range 99M (SET key for 3 seconds, enter the lubrication program setting status display screen with the number flashing (light on), press to increase or decrease to the so-called actual lubrication time: interval time setting (at this time, the number flashing, press ▲ or increase or decrease to the desired time). After confirming the setting is correct, press the SET key to finish

The electric pump starts working at the new set time.

3. When the system is abnormal, the digital flashing well beeps, and the electric pump stops working, indicating that the oil level is insufficient and needs to be refueled


图片11.jpg\


6. The meter meter has arrived, and the meter automatically cuts

图片12.jpg


7. Every time the mold is changed, the core rod of the mold must be coated with high-temperature oil before tightening

图片13.jpg


Before starting the machine, each time a new mold core rod is replaced, it must be baked with a flamethrower for 1 to 3 minutes until there is material coming out before starting the machine


图片14.jpg


When material come out from the die bushing , you should adjust the die head 4 screws to make the material come out directly straight

Just make sure that the material just comes out of the mold is parallel to the material mouth, and then adjust the height of the molding machine


图片15.jpg


8. Adjust the calibration table height when you produce others mould.Rotate to the right to raise the molding machine.


图片16.jpg


图片17.jpg 图片18.jpg


图片19.jpg  图片20.jpg